Engineering Projects
When validating a maritime engineering project, the MSRC can contribute by:
| |
• |
Validating the operational feasibility of a port project |
| |
• |
Creating the real conditions, design or modify database elements |
| |
• |
Manoeuvring ships |
Starting from a geographical area with existing waterways or from a new database design, the MSRC team can virtually reproduce the project so as to carry out complete and realistic ship manoeuvring simulations.
The MSRC also contributed to the Rabaska and Gros-Cacouna methane terminal projects (LNG tankers) on the St. Lawrence River. Among other projects, it also assisted in modeling the Bagotville cruise ship terminal on the Saguenay.
 |
|
 |
|
 |
| |
|
|
|
|
MSRC project realization proposal
|
|
|
|
|
|
|
 |
|
 |
|